
There was plenty of work happening around the region last month, including line marking, signage repairs and pavement repairs.
Below is a summary of the key activities completed by Bundaberg Regional Council, all aimed at enhancing the safety and maintenance of your local roads and surrounds.
Bundaberg
Maintenance grading
- DJL Drive, Kinkuna
- Golchert Drive, Kinkuna
- Nedwich Road, Alloway
- McCormacks Road, Alloway
- Alex Walker Road, Alloway
- Back Windermere Road, Elliott Heads
Footpath repairs
- Kensington Street, Norville
Paving repairs
- Bourbong Street, Bundaberg Central
- Toonburra Street, Bundaberg Central
Line marking
- Lihs Street, Elliott Heads
- High School Road, Gin Gin
- King Street, Gin Gin
- Takalvan Street, Svensson Heights
- Cunnington Street, Bundaberg East
- Quinn Street, Kepnock
- Electra Street, Bundaberg Central
- Branyan Street, Bundaberg West
- Quinn Street, Kepnock
- Lewis Street, Kepnock
- Miller Street, Norville
- Sims Road, Walkervale
- Barolin Street, Bundaberg Central
- Esplanade, Bargara
- Woongarra Scenic Drive, Bargara
- Woongarra Street, Bundaberg Central
Bundaberg area construction
- Anzac Park Redevelopment Earthworks Stage 1, 100% complete
- Gravel Resheeting Program 2024-2025, 95% complete
Childers area
Drainage maintenance
- Erskines Road, Pine Creek
- Gregory Street, Buxton
- Hendle Street, Childers
- Loeskows Road, Booyal
- Marule Road, Booyal
- Sawmill Road, Kallogum
- Thompson Road, Childers
Bitumen patching
- Apple Tree Creek
- Booyal
- Buxton
- Childers
- Duingal
- Farnsfield
- Goodwood
- Gregory River
- North Gregory
- North Isis
- South Isis
- Woodgate
Roadside slashing
- ATC Hall Road, North Isis
- Butchers Road, South Isis
- CSR Depot Road, Childers
- Framptons Road, North Isis
- Henkes Road, North Isis
- Huxley Road, Childers
- Lynwood Road, North Isis
- Schmidts Road, North Isis
- Schofield Lane, Childers
- Smithfield Road, South Isis
- Stockyard Road, North Isis
- Whitebridge Road, North Isis
Maintenance grading Childers and surrounds
- Abington: Abington Road and Hatchery Road
- Apple Tree Creek: Breusch Road
- Doolbi: Goodwins Road
- Isis River: Junction Mountain Road
- Kallogum: Agnesvale Road and Broome Road
- Redridge: Coach Road, Sims Road and Webbs Road
- South Isis: Coles Road, Cooks Road, Jacksons Road, Laceys Road and Rainbows Road
Childers area construction
- Woodgate Esplanade Coast Pathway Renewal, 95% complete
Gin Gin area
Pavement repairs
- Monduran Road, Yandaran
- Reads Road, Bucca
- Settlement Road, Horse Camp
- Stengords Road, Bucca
Shoulder repairs
- Invicta Road, Avondale
- Monduran Road, Monduran
- North Bucca Road, Bucca
- Wallaville Goondoon Road, Bungadoo
- Walla Road, Wallaville
Signage repairs
- Booths Road, St Kilda
- Bowmans Road, Moolboolaman
- Broadmeadows Road, Moolboolaman
- Comonju Road, Wallaville
- Dalysford Road, Dalysford
- Delan Road, Bullyard
- McIlwraith Road, McIlwraith
- Monduran Dam Road, Takilberan
- Moolboolaman Road, Moolboolaman
- Mulgrave Street, Gin Gin
- Prats Road, Drinan
- Settlement Road, Horse Camp
- Tirroan Road, Gin Gin
- Walla Road, Wallaville
- Wallaville Goondoon Road, Bungadoo
- Wonbah Road, Wonbah
Road grading Gin Gin and surrounds
- Boolboonda: Cambria Flats Road, Ellimatta Road, Leathers House Road, Leathers Road and Tunnel Road
- Gaeta: Gaeta Road
- Morganville: Hofstetter Road, Old Gayndah Road, Perry River Farms Road
- St Agnes: St Agnes Road and Tenningering Road
- Wonbah: Lemon Tree Road and Morris Road
- Yandaran: Monduran Road
Gin Gin area construction
- Kolan Flats Road – Bridge Rehabilitation Works, sidetrack reinstated
When is the Master Plan Project at Moore Park Beach due to be completed? When are repairs going to be undertaken to the bridge over the lagoon from Egret Lane to Orchid Avenue? This is a major pathway for locals from Egret Lane to walk to the Community Centre and newly constructed Hub, the Bowls Club, the beach and surf club and park with the dog runs. It is also promoted as a walk of interest to visitors to the town.
Bundaberg region needs to be developing well and rapidly, as its population is growing rapidly.
Please notice that street trees on the street but not along the street are so country-like together with power lines and power poles. Well planned and Long term infrastructure is necessary, if at all.
Typical stupid upgrades, repairs, line markings, footpaths etc. when are the roads going to be sealed from side to side to get rid of the dusty grass verges. The suburban roads are in a disgusting state, potholes etc and nothing is done about them. We are developing so fast but where are 5 star resorts, hotels for visitors, none. Nothing that overseas visitors would expect to stay in. Rockhampton and Gladstone have better accommodations than here.